Pay to Marwadi

Company Profile

H.G. INFRA ENGINEERING LTD.

NSE : HGINFRABSE : 541019ISIN CODE : INE926X01010Industry : Engineering - ConstructionHouse : Private
BSE1200.9013 (+1.09 % )
PREV CLOSE (Rs.) 1187.90
OPEN PRICE (Rs.) 1192.50
BID PRICE (QTY) 1198.65 (5 )
OFFER PRICE (QTY) 1200.70 (16 )
VOLUME 14362
TODAY'S LOW / HIGH (Rs.)1190.95 1225.00
52 WK LOW / HIGH (Rs.)806 1228.75
NSE1200.70 11.55 (+0.97 % )
PREV CLOSE(Rs.) 1189.15
OPEN PRICE (Rs.) 1191.55
BID PRICE (QTY) 1199.30 (64 )
OFFER PRICE (QTY) 1200.70 (58 )
VOLUME 125435
TODAY'S LOW / HIGH(Rs.) 1190.00 1227.95
52 WK LOW / HIGH (Rs.)805.1 1229

Company News

Date Heading Details
26-Apr-2024 HG Infra Engineering's arm incorporates wholly owned subsidiaries <p style="text-align: justify;">HG Infra Engineering's wholly owned subsidiary -- H.G. Solar Projects has incorporated the wholly owned subsidiaries in the name of H.G. Solar Park and H.G. Solar Park Developer. Both the subsidiaries will carry out business in the field of Solar Power.</p><p style="text-align: justify;">HG Infra Engineering is an infrastructure construction, development and management company with extensive experience in its focus area of road projects, including highways, bridges and flyovers.</p><div style="text-align: justify;"><br></div>
09-Apr-2024 H.G. Infra Engineering incorporates wholly owned subsidiary <p style="text-align: justify;">H.G. Infra Engineering has incorporated a wholly owned subsidiary (WOS) company namely ‘H.G. Chennai-Tirupati (II) Highway' a Special Purpose Vehicle (SPV) on April 08, 2024 to undertake project awarded by National Highways Authority of India (NHAI)</p><p style="text-align: justify;">The project is for Access Controlled Highway of 4 Lane with Paved Shoulders from TN/AP Border (Design Chainage km 61+51) to Puttur (Design Chainage Km 81+540) of NH-716 &amp; 6 Lane with Paved Shoulders from Mallavaram (Design Chainage Km 97+100) to Renigunta (Design Chainage Km 114+500) of NH-71 in the state of Andhra Pradesh on Hybrid Annuity Mode under NH(O) (Chennai-Tirupati Package-II). The project cost is Rs 862.11 crore and the construction period is 24 months.</p><p style="text-align: justify;">HG Infra Engineering is an infrastructure construction, development and management company with extensive experience in its focus area of road projects, including highways, bridges and flyovers.</p><div style="text-align: justify;"><br></div>
09-Apr-2024 H.G. Infra Engineering trades with traction on incorporating wholly owned subsidiary <p></p><div style="text-align: justify;">H.G. Infra Engineering is currently trading at Rs. 1087.85, up by 16.80 points or 1.57% from its previous closing of Rs. 1071.05 on the BSE.</div><div style="text-align: justify;"><br></div><div style="text-align: justify;">The scrip opened at Rs. 1082.80 and has touched a high and low of Rs. 1109.30 and Rs. 1079.60 respectively. So far 17701 shares were traded on the counter.</div><div style="text-align: justify;"><br></div><div style="text-align: justify;">The BSE group 'A' stock of face value Rs. 10 has touched a 52 week high of Rs. 1123.05 on 8-Apr-2024 and a 52 week low of Rs. 806.00 on 27-Dec-2023.</div><div style="text-align: justify;"><br></div><div style="text-align: justify;">Last one week high and low of the scrip stood at Rs. 1123.05 and Rs. 991.35 respectively. The current market cap of the company is Rs. 7052.49 crore.</div><div style="text-align: justify;"><br></div><div style="text-align: justify;">The promoters holding in the company stood at 74.53%, while Institutions and Non-Institutions held 14.00% and 11.47% respectively.</div><div style="text-align: justify;"><br></div><div style="text-align: justify;">H.G. Infra Engineering has incorporated a wholly owned subsidiary (WOS) company namely ‘H.G. Chennai-Tirupati (II) Highway' a Special Purpose Vehicle (SPV) on April 08, 2024 to undertake project awarded by National Highways Authority of India (NHAI)</div><div style="text-align: justify;"><br></div><div style="text-align: justify;">The project is for Access Controlled Highway of 4 Lane with Paved Shoulders from TN/AP Border (Design Chainage km 61+51) to Puttur (Design Chainage Km 81+540) of NH-716 &amp; 6 Lane with Paved Shoulders from Mallavaram (Design Chainage Km 97+100) to Renigunta (Design Chainage Km 114+500) of NH-71 in the state of Andhra Pradesh on Hybrid Annuity Mode under NH(O) (Chennai-Tirupati Package-II). The project cost is Rs 862.11 crore and the construction period is 24 months.</div><div style="text-align: justify;"><br></div><div style="text-align: justify;">HG Infra Engineering is an infrastructure construction, development and management company with extensive experience in its focus area of road projects, including highways, bridges and flyovers.</div><p></p>
08-Apr-2024 Clarification - Proceedings Of The 21St Annual General Meeting Of Shareholders Held On August 21, 2023 Clarification - Proceedings of the 21st Annual General Meeting of shareholders.
08-Apr-2024 Clarification - Proceedings Of The 21St Annual General Meeting Of Shareholders Held On August 21, 2023 Clarification - Proceedings of the 21st Annual General Meeting of shareholders.
02-Apr-2024 H.G. Infra Engineering informs about award of order <div>H.G. Infra Engineering has informed that two letters of award have been issued by Jodhpur Vidyut Vitran Nigam to Stockwell Solar Services consortium with H.G. Infra Engineering (the Company) for the projects of solar power plants. The details of the aforesaid projects as required under Regulations 30 and 51 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, read with the SEBI Circular No. SEBI/HO/CFD/CFD-PoD-1/P/CIR/2023/123, dated July 13, 2023, are enclosed as Annexure A. In accordance with provisions of the SEBI (Prohibition of Insider Trading) Regulations, 2015 and the Company's Code of Prohibition of Insider Trading, the Trading Window for dealing in the securities of the Company is already closed for all designated persons and their immediate relatives till 48 hours after the declaration of audited financial results of the Company for the quarter and financial year ended March 31, 2024.</div><div><br></div><div>The above information is a part of company's filings submitted to BSE.</div><div><br></div>
23-Mar-2024 H.G. Infra Engineering informs about award of order <div style="text-align: justify;">Pursuant to Regulations 30 and 51 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, H.G. Infra Engineering has informed that a letter of award has been issued by Jodhpur Vidyut Vitran Nigam to Stockwell Solar Services Consortium with H.G. Infra Engineering (the Company) for the project of Solar Business. The details of aforesaid project as required under Regulations 30 and 51 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015, read with the SEBI Circular No. SEBI/HO/CFD/CFD-PoD1/P/CIR/2023/123, dated July 13, 2023, are enclosed as Annexure A. In accordance with provisions of the SEBI (Prohibition of Insider Trading) Regulations, 2015 and the Company's Code of Prohibition of Insider Trading, the Trading Window for dealing in the securities of the Company is closed for all designated persons and their immediate relatives till March 25, 2024.</div><div style="text-align: justify;"><br></div><div style="text-align: justify;">The above information is a part of company's filings submitted to BSE.</div>
22-Mar-2024 H.G. Infra Engineering informs about closure of trading window <p style="text-align: justify;">Pursuant to the Securities and Exchange Board of India (Prohibition of Insider Trading) Regulations, 2015 and the Company's Code of Prohibition of Insider Trading, H.G. Infra Engineering has informed that the Trading Window for dealing in the securities of the Company will be closed for all designated persons and their immediate relatives from April 01, 2024, till 48 hours after the declaration of audited financial results of the Company for the quarter and financial year ending March 31, 2024.</p><div>The above information is a part of company's filings submitted to BSE.</div>
13-Mar-2024 H.G. Infra Engineering gets letter of acceptance from East Central Railway <p style="text-align: justify;">H.G. Infra Engineering has received the Letter of Acceptance (LoA) dated March 12, 2024 from the East Central Railway for Construction of double line track (3rd &amp; 4th line) formation including earth work, blanketing, minor bridges, electrification works and other miscellaneous works for 32.5 T axle load including Electrical TRD (2x25 KV) in Gaya-Son Nagar section (in between DFCC CH:225.300 (IR CH:475.200) to DFCC CH:292.175 (IR CH:542.075)) in DDU Division of East Central Railway in the state of Bihar. The project cost is Rs 709.11 crore and the construction period is 36 months.</p><p style="text-align: justify;">H.G. Infra Engineering is an infrastructure construction, development and management company with extensive experience in its focus area of road projects, including highways, bridges and flyovers.</p><div style="text-align: justify;"><br></div>
12-Mar-2024 H.G. Infra Engineering gets LoA worth Rs 862.11 crore from NHAI <p style="text-align: justify;">H.G. Infra Engineering has received the Letter of Award (LoA) from the National Highways Authority of India (NHAI) for Access Controlled Highway of 4 Lane with Paved Shoulders from TN/AP Border (Design Chainage km 61+51) to Puttur (Design Chainage Km 81+450) of NH-716 &amp; 6 Lane with Paved Shoulders from Mallavaram (Design Chainage Km 97+100) to Renigunta (Design Chainage Km 114+500) of NH-71 in the state of Andhra Pradesh on Hybrid Annuity Mode under NH(O) (Chennai-Tirupati Package-II). The project cost is Rs 862.11 crore and the construction period is 24 months.&nbsp;</p><p style="text-align: justify;">H.G. Infra Engineering is an infrastructure construction, development and management company with extensive experience in its focus area of road projects, including highways, bridges and flyovers.</p>