Pay to Marwadi

Company Profile

DILIP BUILDCON LTD.

NSE : DBLBSE : 540047ISIN CODE : INE917M01012Industry : Construction - Real EstateHouse : Dilip Buildcon
BSE461.80-2 (-0.43 % )
PREV CLOSE (Rs.) 463.80
OPEN PRICE (Rs.) 464.00
BID PRICE (QTY) 461.70 (7 )
OFFER PRICE (QTY) 462.30 (6 )
VOLUME 10026
TODAY'S LOW / HIGH (Rs.)456.60 464.00
52 WK LOW / HIGH (Rs.)159.7 504.45
NSE462.15 -2.3 (-0.5 % )
PREV CLOSE(Rs.) 464.45
OPEN PRICE (Rs.) 464.50
BID PRICE (QTY) 461.85 (26 )
OFFER PRICE (QTY) 462.20 (110 )
VOLUME 188039
TODAY'S LOW / HIGH(Rs.) 456.05 464.50
52 WK LOW / HIGH (Rs.)159.55 504.5

Smart Quotes

1D 1M 3M 1Y 3Y 5Y
STOCK SUMMARY
Trade Value (Rs. in Lacs) 0.00
Dividend Yield(%) 0.02
TTM EPS (Rs.) 24.39
P/E Ratio 18.81
Book Value (Rs.) 335.70
Face Value (Rs.) 10
MCap (Rs. in Mn) 67098.05
Price/Earning (TTM) 9.34
Price/Sales (TTM) 0.64
Price/Book (MRQ) 1.37
PAT Margin (%) 2.19
ROCE (%) 10.80
Incorporation Year : 2006

Management Info :

Dilip Suryavanshi - Chairman Dilip Suryavanshi - Managing Director

Registered Office :

Address : Plot No. 5 Inside Govind Narayan Singh Gate ,Chuna Bhatti,Kolar Road ,
Bhopal,
Madhya Pradesh-462016

Phone : 0755 4029 999

Registrar's Details : Link Intime India Pvt Ltd.
C 101, 247 Park,LBS Marg,Vikhroli (West),Mumbai
Listing : BSE, NSE
NEWS More
25Apr04-25-2024$Dilip Buildcon gets provisional completion certificate for Tamil Naidu project Dilip Buildcon gets provisio

Dilip Buildcon has received Provisional Completion Certificate for the project ‘Four-laning of VillupuramPuducherry Section of NH-45A (New NH332) from km 00+000 to km 29+000 (Design Chainage) under Bharatmala Pariyojana Phase – I (Residual NHDP IV works) on HAM in the State of Tamil Naidu and Union Territory of Puducherry.’ The Provisional Completion Certificate has been issued by the authority and had declared the project fit for entry into commercial operation as on April 04, 2024. The project cost was Rs 1013 crore. 

Dilip Buildcon’s core business is undertaking construction projects across India in the roads and irrigation sectors. They specialize in constructing state and national highways, city roads, culverts and bridges.


Dilip Buildcon has received Provisional Completion Certificate..
24Apr04-24-2024$Dilip Buildcon informs about non-applicability of large corporate entity Dilip Buildcon informs about

Pursuant to SEBI Circular No. SEBI/HO/DDHS/DDHS-RACPOD1/P/CIR/2023/172 dated October19,2023 (‘SEBI Circular’) with respect of the fund raising by issuance of Debt Securities by large entities, Dilip Buildcon has informed that the company does not fall under the category of Large Corporates as specified in the said circular.

The above information is a part of company’s filings submitted to BSE.


Pursuant to SEBI Circular No. SEBI/HO/DDHS/DDHS-RACPOD1/P/CIR/2..
09Apr04-09-2024$Dilip Buildcon emerges as L-1 bidder for Haryana project Dilip Buildcon emerges as L-

Dilip Buildcon has been declared as L-1 bidder for the tender floated by the Haryana Rail Infrastructure Development Corporation on EPC mode in the state of Haryana. The project is for Contract Package C5: Composite Contract package in connection with New BG Double Railway Line of HORC project between stations Prithla and Dhulawat for: (i) Design and Construction of Civil Works (Earthwork, Bridges, Stations and Retaining Walls) from km -2.296 to km 12.00 & km 18.00 to km 20.942; (ii) Design & Construction of viaduct from km 20.942 to km 24.844; (iii) Design & Construction of Ballastless track from km 20.842 to km 24.844; and (iv) Design, Supply, Installation, Testing & Commissioning of General Electrical Services from km -2.296 to km 12.00 and Km 18.00 to Km 24.844.  The bid project cost is Rs 1092.46 crore. The completion period of the project is 36 months.

Dilip Buildcon’s core business is undertaking construction projects across India in the roads and irrigation sectors. They specialize in constructing state and national highways, city roads, culverts and bridges.


Dilip Buildcon has been declared as L-1 bidder for the tender f..
09Apr04-09-2024$Dilip Buildcon shines on emerging as L-1 bidder for Haryana project Dilip Buildcon shines on eme

Dilip Buildcon is currently trading at Rs. 477.95, up by 8.30 points or 1.77% from its previous closing of Rs. 469.65 on the BSE.

The scrip opened at Rs. 495.25 and has touched a high and low of Rs. 500.40 and Rs. 477.50 respectively. So far 86837 shares were traded on the counter.

The BSE group 'A' stock of face value Rs. 10 has touched a 52 week high of Rs. 504.45 on 19-Feb-2024 and a 52 week low of Rs. 159.70 on 19-May-2023.

Last one week high and low of the scrip stood at Rs. 500.40 and Rs. 457.80 respectively. The current market cap of the company is Rs. 7043.18 crore.

The promoters holding in the company stood at 70.15%, while Institutions and Non-Institutions held 11.95% and 17.90% respectively.

Dilip Buildcon has been declared as L-1 bidder for the tender floated by the Haryana Rail Infrastructure Development Corporation on EPC mode in the state of Haryana. The project is for Contract Package C5: Composite Contract package in connection with New BG Double Railway Line of HORC project between stations Prithla and Dhulawat for: (i) Design and Construction of Civil Works (Earthwork, Bridges, Stations and Retaining Walls) from km -2.296 to km 12.00 & km 18.00 to km 20.942; (ii) Design & Construction of viaduct from km 20.942 to km 24.844; (iii) Design & Construction of Ballastless track from km 20.842 to km 24.844; and (iv) Design, Supply, Installation, Testing & Commissioning of General Electrical Services from km -2.296 to km 12.00 and Km 18.00 to Km 24.844.  The bid project cost is Rs 1092.46 crore. The completion period of the project is 36 months.

Dilip Buildcon’s core business is undertaking construction projects across India in the roads and irrigation sectors. They specialize in constructing state and national highways, city roads, culverts and bridges.


Dilip Buildcon is currently trading at Rs. 477.95, up by 8.30 p..
19Mar03-19-2024$Lemon Tree Hotels, Swan Energy and Venus Remedies to see some action today Lemon Tree Hotels, Swan Ener

Lemon Tree Hotels has signed new property -- Lemon Tree Hotels, Agartala. The property is expected to open in FY27 and shall be managed by Carnation Hotels, a wholly-owned subsidiary and the management arm of Lemon Tree Hotels. Lemon Tree Hotels, Agartala will feature 80 well-appointed rooms, two restaurants, a bar, banquet facilities, meeting rooms, a swimming pool, a fitness center and other public areas.

Veritas (India), a Subsidiary Company of Swan Energy in consortium with Genesys International Corporation has received Letter of Acceptance from Brihanmumbai Municipal Corporation (BMC) of Rs 155.85 crore for Development, Implementation, Maintenance of 3D City model & Change Detection using Geospatial Technology for BMC.

Venus Remedies has expanded the reach of its oncology drugs in the Asia Commonwealth of Independent States (CIS) region with marketing authorisations from Ukraine for three cancer drugs -- paclitaxel, oxaliplatin and irinotecan. Its total volume of exports to Ukraine stands at $2.20 million. By strengthening its product portfolio in Ukraine, the company aims to increase this figure by 20 per cent in the next one year. The company is awaiting approval from Ukraine on another 10 applications for marketing authorisations.

Dilip Buildcon through Dilip Buildcon - Vijay Kumar Mishra Construction (Joint Venture) [DBL-VKMCPL (JV)] has received letter of acceptance (LoA) for the construction of Machhrewa Irrigation Project Dam and Pressurized pipe irrigation network on Turn key basis. The project cost is Rs 412.92 crore. The completion period of the project is 60 months. 

RPP Infra Projects has been received a Letter of Acceptance (LoA) for a new projects viz, State Industries Promotion Corporation of Tamilnadu (SIPCOT) - Formation of Northern, Western and Eastern Side Internal Roads (10.20 M & 30 M wide), Construction of RCC Drain, RCC Culvert, Minor Bridges, Providing Pipe cause way and Street Light arrangements in SIPCOT Industrial Park, Shoolagiri, Hosur Phase-IV at a contract price of Rs 94.13 crore (Inclusive of GST). The projects are to be executed within 11 months.

NTPC is all set to start commercial operations of second unit of its North Karanpura Super Thermal Power Project on March 20. NTPC's North Karanpura Super Thermal Power project (STPP) is a coal-based power plant located in the Chatra district of Jharkhand.

NIBE has received purchase order from Larsen and Toubro, for assemblies and sub-assemblies of Heavy Structures including construction gabion walls for a total consideration of Rs 21.83 crore (inclusive of all taxes and duties). The said order is to be executed on or before July 15, 2024. 

Lemon Tree Hotels has signed new property -- Lemon Tree Hotels,..
Financials More
Rs. in Millions
QTR Dec 23 ANNUAL 23
Net Profit952.9299999999982217.74
Gross Profit 1500.2 2797.35
Operating Profit 3441.6710530.83
Net Sales 25710.96101195.28
ROLLING FORWARD P/E (EOD)
EVENT CALENDAR
peer group More
Signatureglobal Ind. (BSE)
 1260.40 (4.01%)
M.Cap ( in Cr)
17453.54
Arvind Smartspaces (BSE)
 751.00 (6.62%)
M.Cap ( in Cr)
3380.85
Victoria Mills (BSE)
 4205.00 (1.06%)
M.Cap ( in Cr)
41.40
Brigade Enterprises (BSE)
 1040.50 (2.35%)
M.Cap ( in Cr)
23894.56
Sobha (BSE)
 1747.00 (1.35%)
M.Cap ( in Cr)
16382.25
Shareholding Pattern More
PROMOTERS 70.15 %
MUTUAL FUNDS/UTI 6.13 %
FI/BANKS/INSURANCE 2.95 %
NON-INSTITUTION 17.88 %
GOVERNMENT 0 %
FII 0 %
F & O Quotes